Search

Gallery

A Few of Our Projects

Alexandra Bridge

During repair work on the bridge in 2014, we assisted the general contractor by positioning a barge under the bridge, on several occasions, to allow the installation of a temporary floor underneith.
In November 2019, we helped dismantle the barges in winter conditions. From April to December 2020, we moved the 3 barges on the site and ensured the safety of the staff. The depth of the water exceeds 80 feet.

NCC Dock,
Richmond Landing

In 2018, we transported the new Richmond Landing dock and participated in it's installation.

Casino Lac-Leamy
Sound of Light Firework Barge

Since 2012, we have taken charge of all assembly and disassembly of all the equipment that is on the water.
This involves launching and loading the eight barges using a 350 ton crane.
We also provide transport from the storage site to the event site and complete the final assembly. We install 10 safety buoys around the site, according to Transport Canada requirements.

Municipal Marinas

Since 2014, we have done winter storage of municipal marina docks which have 10, 12, and 24 slips.